Colorado Factory Built Quality Program

$197.00

Every section of the DOH Manufacturer Quality Assurance Manual Checklist – A through J – is answered by a fully editable document in this kit, ready to customize with your company name, then submit.

SKU: 876 Category:

Description

Your factory-built structures need Colorado’s State Insignia — and the Division of Housing won’t issue it without a certified quality program under 8 CCR 1302-14.

The Colorado factory-built quality program kit delivers the complete QA/QC manual, procedures, forms, and inspection records — 67 fully editable MS Office documents ready to adapt to your operation.

Browse the PDF Demo | View Kit Contents (text file listing all 67 documents)

If your Company manufactures factory-built structures for sale or use in Colorado, 8 CCR 1302-14 requires manufacturer registration, design approval, and a functioning quality assurance program before the Division of Housing (DOH) will issue the State Insignia that must be permanently attached to every outgoing unit. No Insignia, no sale.

The 8 CCR 1302-14 (effective June 30, 2026) is the current Code of Colorado Regulation for Factory-Built Structures. All references to the defunct Resolution 34 & 35 have been eliminated.

An exemption applies when you sell structures for transportation to and installation in another State — unless the structure returns to Colorado for use. Out-of-State Factory-Built facilities that transport for use in Colorado require State, Local Government, or National-Listed-Firm authorized Third-Party Inspection Agencies (TPIA), or out-of-State registered/certified factory-built manufacturer status to enable conformity with 8 CCR 1302-14 and Colorado construction codes.

What the DOH Requires — and What This Kit Delivers

The DOH does not provide a sample quality manual. They provide a Manufacturer Quality Assurance Manual Checklist with ten sections (A through J) that your manual must address. This kit maps directly to every section:

A. Organizational Chart & QA/QC Personnel — Organization chart template, training records, and resume documentation. QA/QC personnel may not report to the Production Manager or be part of the production team.

B. Document Initiation and Control — Document control procedure, document issue log, revision log, and transmittal log. Construction must not start until the manufacturer possesses CDOH-approved plans. Insignias must be kept under lock and key, controlled by the QA/QC Manager.

C. Purchasing Guidelines and Procedure — Purchasing procedure, purchase order, purchase requisition, purchase order review, approved supplier list, supplier evaluation form, and supplier performance rating. Materials and components must be checked for quality by the receiving department.

D. Factory Layout Diagram — Work instruction templates for documenting workstations, material storage areas (with nonconforming item segregation), and shipping/receiving areas.

E. Personnel Training Procedures — Training program, training log, training matrix for QMS procedures, and training orientation request form. Covers new hires, job duty changes, and cross-training between QA/QC and production staff.

F. In-Plant Procedures for Authorized Third-Party Inspection Agency (TPIA) — Inspection procedures covering authorized TPIA visit frequency, scheduling, unannounced access, and access to CDOH-approved plans.

G. Sample QA/QC Forms & Checklists — Inspection checklist, inspection form, inspection observations, inspection record, inspection report, inspection summary, routing tickets, traveler template, and QC tags. Every form tracks model and serial number. QA/QC personnel sign and certify all inspections.

H. Systems Test Procedures — Validation/verification form and inspection records covering plumbing water supply (P2503 IRC/IPC), plumbing DWV, gas installations (G2417 IRC/IFGC), and electrical continuity, operational, and polarity checks (Article 545 NEC).

I. Record Retention — Document control procedures establishing the five-year minimum retention requirement.

J. Non-Conforming Items — Control of nonconformities procedure, nonconformance report form, corrective action procedure, corrective action request forms, corrective action log, and calculated risk release form. All conditions adverse to quality must be promptly investigated, documented, and corrected.

More Than a Simple Management System, Less Than Full ISO 9001

The Colorado Factory Built quality program is designed for manufacturers that need a structured, auditable QA/QC system to satisfy State certification — without the overhead of implementing ISO 9001. It covers the quality disciplines the DOH expects to see: document control, purchasing, receiving inspection, in-process inspection, nonconformance management, corrective action, training, and record retention. If your operation later pursues ISO 9001 or another standard, the procedures and forms in this kit provide a working foundation to build from.

If you need less structure, see our ISO 10005 Quality Plan for a general-purpose quality system plan.

Open vs. Closed Construction — Know Your Regulatory Path

Closed construction — interior or exterior finishes applied in the factory, encapsulating structural, electrical, or plumbing components; assembled rooms or spaces built off-site; panels with electrical wiring in conduit inside the panel. The DOH approves designs and issues a State Insignia for each conforming unit; in-plant inspections are performed by an authorized Third-Party Inspection Agency (TPIA). This is the Factory Built program, and this kit is built for it.

Open construction — all concealed parts can be readily inspected at the building site without damaging or disassembling the product. Panelized construction assembled on-site, components where all wiring, plumbing, and structural members are visible. The DOH explicitly exempts open panel construction from the factory-built program. Plan review, permitting, and inspection are handled by the Local Building Department at the job site.

The kit includes 67 MS Office documents covering the complete QA/QC manual, all procedures, forms, inspection records, and work instruction templates — plus a completed copy of the DOH Manufacturer Quality Assurance Manual Checklist showing how the kit documents satisfy each DOH requirement section.

We do not impose restrictive digital rights management (DRM) on the Colorado factory-built quality program templates. Downloaded MS Office documents are fully editable and re-usable on as many computers as needed in your business operation according to license terms and conditions.

Adopted Building Codes

Factory-built structures must comply with the building codes adopted and amended by the DOH, as identified in 8 CCR 1302-14:

  1. International Building Code — International Code Council, Inc.
  2. International Residential Code — International Code Council, Inc.
  3. International Mechanical Code — International Code Council, Inc.
  4. International Plumbing Code — International Code Council, Inc.
  5. National Electric Code — National Fire Protection Association, Inc. (edition as adopted by the State of Colorado Electrical Board at the time of plan submittal; 180-day transition period applies)
  6. International Fuel Gas Code — International Code Council, Inc.
  7. International Energy Conservation Code — International Code Council, Inc.

The DOH also references standards from the International Code Council and Modular Building Institute (ICC/MBI) for off-site construction.

SB25-002 — Regional Building Codes (In Effect)

Senate Bill 25-002, signed into law in May 2025, directed the State Housing Board to develop regional building codes for factory-built structures. The implementing administrative rules were adopted and took effect June 30, 2026, codified in 8 CCR 1302-14 as Rule 4.21.3 (regional building design criteria) and Rule 4.21.4 (multi-family plan requirements):

  • Regional Building Codes: Regional building code standards accounting for local climatic and geographic conditions now supersede previous regulations for factory-built structures.
  • Utility Hookups: Licensed plumbers or electricians, rather than installers, must perform the final connections to external utility sources.
  • Coordination: Improved coordination between State and Local permitting processes.

Related Resources

Need help building your QA/QC manual for DOH certification? Contact Frank to discuss your project — no obligation, no sales pitch. Frank has 55 years of quality management experience including factory-built structures and construction quality programs.

Frank Elias — Responsible Quality Authority, Practical Quality Plan

Email: contact@quality-control-plan.com