Description
AS9102 First Article Inspection Procedure Kit
Prime contractors in the aviation, space and defense industries flowdown the requirements of the AS9102 first article inspection procedure to every Supplier with design authority for critical components and assemblies. When Lockheed, General Dynamics, Northrop Grumman, or any other Prime issues a purchase order that calls out AS9102, the Supplier must deliver an acceptable First Article Inspection Report (FAIR) data package before a single production article ships. No FAIR, no shipment authorization.
The AS9102 first article inspection procedure is compliant with SAE standard Rev C dated June 2023. Consider purchasing the SAE sponsored AS9102C standard.
AS9102 First Article Inspection Procedure Is Not a First Piece Inspection
A first piece inspection checks a part against a drawing and moves on — one record, one moment in time. AS9102 is fundamentally different. It validates that the entire production process is capable of producing conforming parts, documented across three standardized forms:
Form 1 — Part Number Accountability: Identifies the part under inspection and every associated sub-assembly or detail part in the configuration.
Form 2 — Product Accountability: Documents the materials, tools, manufacturing processes, and special process sources that produced the article.
Form 3 — Characteristic Accountability: Records every design characteristic — dimensional, material, process, functional — with inspection results traceable to a specific measurement method and instrument.
Every design characteristic on the drawing must be accounted for, uniquely identified with inspection balloons, and verified with objective evidence. This is the standard that separates a shop that can measure a part from a shop that can prove its process.
Six Events That Trigger a Full or Partial FAI
AS9102 is not a one-time event. These trigger conditions require re-accomplishment of the First Article Inspection — and they catch unprepared shops off guard:
1. First production run of a new part number or first-time manufacture.
2. Design change affecting fit, form, or function of the part.
3. Change in manufacturing source, process, or inspection method that can potentially affect fit, form, or function.
4. Change in location of manufacture, tooling, or materials.
5. Two-year lapse in production (or as specified by the customer) — because tooling, processes, suppliers, materials, operators, and inspection methods may no longer match the original approved baseline.
6. Implementation of corrective action required to complete a previous FAI.
That sixth trigger is the one that traps unprepared shops in a loop: a failed FAI triggers corrective action, which itself triggers another FAI. The shop is stuck until the documentation is right.
AS9102 First Article Inspection Procedure Kit, $97
The kit contains the following MS Office documents — fully editable and ready for your operation:
- AS9102 First Article Inspection Procedure — fully compliant AS9102C process with instructions and report forms
- AS9102 Rev C First Article Inspection Reports (.doc)
- AS9102 Rev C First Article Inspection Reports (.xls) — Excel workbook with Forms 1, 2, and 3
- First Article Inspection Procedure — Alternate Style
- First Article Data Package Instructions
- Configuration Definition Data Package — template to create the data package of applicable documents
- Data List — drawing tree of document revision levels
- First Article Inspection Checklist — self assessment
- First Article Instructions — how to perform the first article
- First Piece Inspection Report — general purpose template for activities other than AS9102
- General Purpose First Piece Inspection Report Template
We do not impose restrictive digital rights management (DRM) on the AS9102 first article inspection procedure templates. Downloaded MS Office documents are fully editable and re-usable on as many computers as needed in your business operation according to license terms and conditions.
AS9102 First Article Inspection Procedure Kit, $97
atk.com Asked About Significant Digits for AS9102 First Article Inspection Reports
“Can you help us report significant digits related to first article inspections?”
See ASTM E 29 Standard Practice for using significant digits in test data to determine conformance with specifications, which is applicable to all scientific work regardless of its nature (including the first article inspection procedure).
Example: 0.021″+/-0.001″
0.0211″ to 0.0214″ must be rounded down to 0.021″ for 2 significant digit specifications; 0.0215″ to 0.0219″ must be rounded up to 0.022″ for 2 significant digit specifications (unless the last retained digit from the rounding method is even, e.g., 0.0225″ is rounded down to 0.022″ since the last digit retained is even, while 0.0226″ is rounded up to 0.023″).
Example: 0.0215″+/-0.0015″
0.0211″ to 0.0219″ must be applied as observed — no rounding is possible if the measurement equipment can only read to the 4th decimal place. If the equipment is capable of reading beyond the 4th decimal place then round to the last digit retained as described herein paying particular attention to whether the retained digit is odd or even when followed by the numeral 5.
Example: 550+/-50
499.1 to 499.4 must be rounded down to 499. 499.5 to 499.9 must be rounded up to 500. 600.1 to 600.5 must be rounded down to 600. 600.6 to 600.9 must be rounded up to 601.
Hope this information helps your project.
Related Resources
Need help implementing AS9102 in your quality system? Contact me to discuss your project — no obligation, no sales pitch. I have 55 years of quality management experience including first article inspection programs for NASA flight hardware at Eagle-Picher Technologies, such as the Gravity Probe Einstein Relativity Mission.
Frank Elias — Responsible Quality Authority, JnF Specialties LLC



